FHWA Project R05 IAP Funded Project Case Study

FHWA Project R05 IAP Funded Project Case Study
Author: Shiraz D. Tayabji
Publisher:
Total Pages: 30
Release: 2016
Genre: Pavements, Precast concrete
ISBN:


Download FHWA Project R05 IAP Funded Project Case Study Book in PDF, Epub and Kindle

The production use of precast concrete pavement (PCP) has come a long way over the last 15 years. The technology is gaining wider acceptance in the U.S. for rapid repair and rehabilitation of concrete pavements as well as for heavily trafficked asphalt concrete pavements and intersections. Several U.S. highway agencies have implemented the PCP technology, and other agencies have constructed demonstration projects. In the U.S., the PCP technology is being used for intermittent repairs (full-depth joint repairs or full panel replacement) and for continuous applications (longer length/wider area rehabilitation) with service life expectations of at least 20 years for intermittent repairs and at least 40 years for continuous applications, without significant future corrective treatment. Strategic Highway Research Program 2 (SHRP2) Project R05 was conducted from 2008 to 2012 to develop technical information and guidelines that would encourage the rapid and successful adoption of PCP technology. In 2013, the SHRP2 Implementation Assistance Program (IAP) was created to help state highway agencies, metropolitan planning organizations, and other interested organizations deploy SHRP2-developed products to deliver more efficient, costeffective solutions to meet the complex challenges facing transportation agencies. On March 28, 2014, as part of round 3 of the IAP, four lead adopters were selected to receive financial support from the Federal Highway Administration for implementation of PCP technology. Kansas Department of Transportation, one of the agencies selected as a lead adopter, received an award of 300,000 [dollars] to help offset the cost of the implementation of PCP technology in the State. This case study report provides details of the 2015 PCP use for rehabilitation of two distressed concrete pavement intersections and a bridge approach section along US 73 in Leavenworth, Kansas.

FHWA Project R05 IAP Funded Project Case Study

FHWA Project R05 IAP Funded Project Case Study
Author: Shiraz D. Tayabji
Publisher:
Total Pages: 35
Release: 2016
Genre: Pavements, Precast concrete
ISBN:


Download FHWA Project R05 IAP Funded Project Case Study Book in PDF, Epub and Kindle

The production use of precast concrete pavement (PCP) has come a long way over the last 15 years. The technology is gaining wider acceptance in the U.S. for rapid repair and rehabilitation of concrete pavements as well as for heavily trafficked asphalt concrete pavements and intersections. Several U.S. highway agencies, including Caltrans, Illinois Tollway, and the New Jersey, New York, and Utah State Departments of Transportation, have implemented the PCP technology, and other agencies have constructed demonstration projects. In the U.S., the PCP technology is being used on concrete pavements for intermittent repairs (full-depth joint repairs or full panel replacement) and for continuous applications (longer length/wider area rehabilitation) with service life expectations of at least 20 years for intermittent repairs and at least 40 years for continuous applications, without significant future corrective treatment. The use of PCP on asphalt pavements includes the replacement of ramps, intersections and bus pads. The Strategic Highway Research Program 2 (SHRP2) Project R05 was conducted from 2008 to 2012 to develop technical information and guidelines that would encourage the rapid and successful adoption of PCP technology. In 2013, the SHRP2 Implementation Assistance Program (IAP) was created to help State DOTs, metropolitan planning organizations, and other interested organizations deploy SHRP2-developed products to deliver more efficient, costeffective solutions to meet the complex challenges facing transportation agencies. On March 28, 2014, the Federal Highway Administration—in partnership with the American Association of State Highway and Transportation Officials—announced the selection of several transportation agencies receiving implementation and technical assistance awards as part of round 3 of the SHRP2 IAP. The Texas Department of Transportation, one of the agencies selected as a lead adopter of Project R05 technology, received an award of 300,000 [dollars] to help offset the cost of constructing a PCP project. This case study report provides details of the 2016 PCP use for rehabilitation of a distressed asphalt concrete pavement at the intersection of Route 97 and Route 72 in McMullen/LaSalle County, Texas.

FHWA Project R05 IAP Funded Project Case Study : New Britain Bus Pads Precase Concrete Pavement Demonstration Project

FHWA Project R05 IAP Funded Project Case Study : New Britain Bus Pads Precase Concrete Pavement Demonstration Project
Author: Shiraz D. Tayabji
Publisher:
Total Pages: 35
Release: 2016
Genre: Bus stops
ISBN:


Download FHWA Project R05 IAP Funded Project Case Study : New Britain Bus Pads Precase Concrete Pavement Demonstration Project Book in PDF, Epub and Kindle

The production use of precast concrete pavement (PCP) has come a long way over the last 15 years. The technology is gaining wider acceptance in the U.S. for rapid repair and rehabilitation of concrete pavements as well as for heavily trafficked asphalt concrete pavements and intersections. Several U.S. highway agencies have implemented the PCP technology, and other agencies have constructed demonstration projects. In the U.S., the PCP technology is being used for intermittent repairs (full-depth joint repairs or full panel replacement) and for continuous applications (longer length/wider area rehabilitation) with service life expectations of at least 20 years for intermittent repairs and at least 40 years for continuous applications, without significant future corrective treatment. Strategic Highway Research Program 2 (SHRP2) Project R05 was conducted from 2008 to 2012 to develop technical information and guidelines that would encourage the rapid and successful adoption of PCP technology. In 2013, the SHRP2 Implementation Assistance Program (IAP) was created to help State highway agencies, metropolitan planning organizations, and other interested organizations deploy SHRP2-developed products to deliver more efficient, costeffective solutions to meet the complex challenges facing transportation agencies. On August 7, 2015, the Federal Highway Administration—in partnership with the American Association of State Highway and Transportation Officials—announced the selection of 21 transportation agencies receiving implementation and technical assistance awards as part of Round 6 of the SHRP2 IAP. The Connecticut Department of Transportation, one of the agencies selected as a lead adopter of Project R05 technology, received an award of 150,000 [dollars] to help offset the cost of constructing a PCP project. Connecticut also received user-incentive funds, in the amount of 75,000 [dollars], for the development of plans, specifications, and estimates (PS&E) related technology transfer activities leading to agencywide adoption of PCP technology. This case study report provides details of the 2016 PCP use for rehabilitation of two distressed asphalt concrete bus pads along a section of the busway of CTfastrak, a bus rapid transit system in New Britain, Connecticut.

Suspension of Community Eligibility (Us Federal Emergency Management Agency Regulation) (Fema) (2018 Edition)

Suspension of Community Eligibility (Us Federal Emergency Management Agency Regulation) (Fema) (2018 Edition)
Author: The Law The Law Library
Publisher: Createspace Independent Publishing Platform
Total Pages: 26
Release: 2018-09-23
Genre:
ISBN: 9781727574111


Download Suspension of Community Eligibility (Us Federal Emergency Management Agency Regulation) (Fema) (2018 Edition) Book in PDF, Epub and Kindle

Suspension of Community Eligibility (US Federal Emergency Management Agency Regulation) (FEMA) (2018 Edition) The Law Library presents the complete text of the Suspension of Community Eligibility (US Federal Emergency Management Agency Regulation) (FEMA) (2018 Edition). Updated as of May 29, 2018 This rule identifies communities, where the sale of flood insurance has been authorized under the National Flood Insurance Program (NFIP), that are scheduled for suspension on the effective dates listed within this rule because of noncompliance with the floodplain management requirements of the program. If the Federal Emergency Management Agency (FEMA) receives documentation that the community has adopted the required floodplain management measures prior to the effective suspension date given in this rule, the suspension will not occur and a notice of this will be provided by publication in the Federal Register on a subsequent date. This book contains: - The complete text of the Suspension of Community Eligibility (US Federal Emergency Management Agency Regulation) (FEMA) (2018 Edition) - A table of contents with the page number of each section

Enroute Supplement Australia

Enroute Supplement Australia
Author: Airservices Australia Publications Centre
Publisher:
Total Pages: 292
Release: 2001
Genre:
ISBN: 9780957899124


Download Enroute Supplement Australia Book in PDF, Epub and Kindle