National Program for Inspection of Non-Federal Dams. Goose Cove Reservoir Dams & Dikes, North Dam MA 01098, Northwest Dike MA 01099, South Dam MA 00163 and Southwest Dike MA 01100, Annisquam River Basin, Gloucester, Massachusetts. Phase I Inspection Report
Author | : CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. |
Publisher | : |
Total Pages | : 135 |
Release | : 1981 |
Genre | : |
ISBN | : |
Download National Program for Inspection of Non-Federal Dams. Goose Cove Reservoir Dams & Dikes, North Dam MA 01098, Northwest Dike MA 01099, South Dam MA 00163 and Southwest Dike MA 01100, Annisquam River Basin, Gloucester, Massachusetts. Phase I Inspection Report Book in PDF, Epub and Kindle
The North Dam is a 318 ft. long earth dam with a maximum height of 34.7 ft. Generally, the dam is in fair condition. There are deficiencies which must be corrected. The South Dam is a 551 ft. long earth dam. The dam is also in fair condition. Both dikes are in fair condition. They also have deficiencies which must be corrected. (Author).