Interim Remedial Measures Citizen Participation Plan for Activities at Ithaca Court Street Former Manufactured Gas Plant (MGP) Site, City of Ithaca, Tompkins County, New York

Interim Remedial Measures Citizen Participation Plan for Activities at Ithaca Court Street Former Manufactured Gas Plant (MGP) Site, City of Ithaca, Tompkins County, New York
Author: New York State Electric and Gas Corporation
Publisher:
Total Pages:
Release: 2000
Genre: Coal-tar
ISBN:


Download Interim Remedial Measures Citizen Participation Plan for Activities at Ithaca Court Street Former Manufactured Gas Plant (MGP) Site, City of Ithaca, Tompkins County, New York Book in PDF, Epub and Kindle

Work plan for clean up of coal tar, coal tar soils and coal tar contaminated water in two subsurface concrete structures formerly operated by the New York State Electric and Gas Corporation and used as gas holders until 1927. These structures are located on land bordering ther corner of North Plain Street and West Court Street in Ithaca, New York.

Interim Remedial Measures Final Engineering Report for Activities at Ithaca Court Street Former Manufactured Gas Plant Site, City of Ithaca, Tompkins County, New York

Interim Remedial Measures Final Engineering Report for Activities at Ithaca Court Street Former Manufactured Gas Plant Site, City of Ithaca, Tompkins County, New York
Author: New York State Electric and Gas Corporation
Publisher:
Total Pages:
Release: 2001
Genre: Coal-tar
ISBN:


Download Interim Remedial Measures Final Engineering Report for Activities at Ithaca Court Street Former Manufactured Gas Plant Site, City of Ithaca, Tompkins County, New York Book in PDF, Epub and Kindle

This report documents the implementation of the approved remedial measures at the Ithaca Court Street Former MGP Site, City of Ithaca, Tompkins County, New York. The remedial work can be characterized as controlled removal and disposal of contaminated water, soil and coal tar associated with two underground former tar storage vessels. This work was proposed in a document titled Interim Remedial Measures Work Plan, which was reviewed and approved by the New York State Dept. of Environmental Conservation.

Interim Remedial Measures Work Plan for Activities at Ithaca Court Street Former MGP Site Subsurface Wooden Duct Extension, City of Ithaca, Tompkins County, New York

Interim Remedial Measures Work Plan for Activities at Ithaca Court Street Former MGP Site Subsurface Wooden Duct Extension, City of Ithaca, Tompkins County, New York
Author: New York State Electric and Gas Corporation
Publisher:
Total Pages:
Release: 2000
Genre: Coal-tar
ISBN:


Download Interim Remedial Measures Work Plan for Activities at Ithaca Court Street Former MGP Site Subsurface Wooden Duct Extension, City of Ithaca, Tompkins County, New York Book in PDF, Epub and Kindle

This is the work plan for the coal tar subsurface wooden duct removal proposed for the Ithaca Court Street Former Manufactured Gas Plant (MGP) Site located in the City of Ithaca, Tompkins County, New York. It involves excavation and disposal of free phase tar contained in the subsurface wooden duct and any coal tar soils around the duct. The plan describes the techniques to be utilized for the sampling, excavation, material handling, community air monitoring, waste characteriztion, transportation and disposal of MGP residues.

Interim Remedial Measures Final Engineering Report for Activities at Ithaca Court Street Former Manufactured Gas Plant Site Subsurface Wooden Duct Extension, City of Ithaca, Tompkins County, New York

Interim Remedial Measures Final Engineering Report for Activities at Ithaca Court Street Former Manufactured Gas Plant Site Subsurface Wooden Duct Extension, City of Ithaca, Tompkins County, New York
Author: New York State Electric and Gas Corporation
Publisher:
Total Pages:
Release: 2001
Genre: Coal-tar
ISBN:


Download Interim Remedial Measures Final Engineering Report for Activities at Ithaca Court Street Former Manufactured Gas Plant Site Subsurface Wooden Duct Extension, City of Ithaca, Tompkins County, New York Book in PDF, Epub and Kindle

This report summarizes the implementation of the approved Interim Remedial Measures Work Plan for Activities at Ithaca Court street Former Manufactured Gas Plant Site, Subsurface Wooden Duct Extension, City of Ithaca, Tompkins County, New York which was accomplished from March 13, 2000 through March 24, 2000. This work consisted of removal and disposal of free phase tar contained in the subsurface wooden duct and any coal tar contaminated soil surrounding the duct that exists under the properties of the Old Port Harbor Restaurant and Watts Distributing Compnay. The wooden duct was part of the plant operation that connected the Ithaca Court Street Former Manufactured Gas Plant (MGP) Site and the Ithaca Cayuga Inlet Coal Tar Site.

Supplemental Remedial Investigation Citizen Participation Plan for Activities at Ithaca Court Street Former Manufactured Gas Plant (MGP) Site, City of Ithaca, Tompkins County, New York

Supplemental Remedial Investigation Citizen Participation Plan for Activities at Ithaca Court Street Former Manufactured Gas Plant (MGP) Site, City of Ithaca, Tompkins County, New York
Author: New York State Electric and Gas Corporation
Publisher:
Total Pages: 7
Release: 2001
Genre: Coal-tar
ISBN:


Download Supplemental Remedial Investigation Citizen Participation Plan for Activities at Ithaca Court Street Former Manufactured Gas Plant (MGP) Site, City of Ithaca, Tompkins County, New York Book in PDF, Epub and Kindle

Interim Remedial Measures Final Engineering Report for Activities at Ithaca First Street Former MGP Site, City of Ithaca, Tompkins County, New York

Interim Remedial Measures Final Engineering Report for Activities at Ithaca First Street Former MGP Site, City of Ithaca, Tompkins County, New York
Author: New York State Electric and Gas Corporation
Publisher:
Total Pages:
Release: 1999
Genre: Coal-tar
ISBN:


Download Interim Remedial Measures Final Engineering Report for Activities at Ithaca First Street Former MGP Site, City of Ithaca, Tompkins County, New York Book in PDF, Epub and Kindle

This report summarizes the implementation of the approved work plan which was implemented from August 3, 1998 through October 27, 1998 at the Ithaca First Street Former MGP Site, presently the Ithaca Municipal Waste Water Treatment Facility, located on Third Street in the City of Ithaca. The work plan was undertaken by NYSEG and consisted of the removal and disposal of 12,610 tons of stockpiled coal tar soil and debris. This material was generated in 1986 during a phase of construction for the Waste Water Treatment Facility, and the contaminated soil was stockpiled on the northern portion of the Facility. This work plan was reviewed and approved on July 31, 1998 by the New York State Department of Environmental Conservation.

Interim Remedial Measures Work Plan for Removal of Coal Tar Impacted Soil on Washington Street Between W. Court and Cascadilla Streets

Interim Remedial Measures Work Plan for Removal of Coal Tar Impacted Soil on Washington Street Between W. Court and Cascadilla Streets
Author: New York (State). Dept. of Health
Publisher:
Total Pages:
Release: 2005
Genre: Coal-tar
ISBN:


Download Interim Remedial Measures Work Plan for Removal of Coal Tar Impacted Soil on Washington Street Between W. Court and Cascadilla Streets Book in PDF, Epub and Kindle

This is the final work plan for the removal and disposal of coal tar impacted soil that exists along the west side of Washington St., between W. Court and Cascadilla Streets in the city of Ithaca, New York. This area was contaminated by the subsurface wooden ducts on W. Court St. that transported coal tar from the Court Street Former Manufactured Gas Plant Site. The work plan describes the techniques to be utilized for the sampling, community air monitoring, excavation, material handling, waste characterization, transportation and disposal of coal tar impacted soil and materials.

Final Work Plan for a Supplemental Remedial Investigation at the Ithaca Court Street MGP Site

Final Work Plan for a Supplemental Remedial Investigation at the Ithaca Court Street MGP Site
Author: IT Corporation
Publisher:
Total Pages:
Release: 2001
Genre: Coal-tar
ISBN:


Download Final Work Plan for a Supplemental Remedial Investigation at the Ithaca Court Street MGP Site Book in PDF, Epub and Kindle

This Supplemental Remedial Investigation was conducted by NYSEG (New York State Electric & Gas Corporation) at the Ithaca Court Street Former Manufactured Gas Plant (MGP) Site in the City of Ithaca, Tompkins County, New York. This plan presents the overall project approach and provides the details and rationale for the quantity and locations of samples required to delineate the nature and extent of MGP-impacted media at the site.

Draft Interim Remedial Measures Work Plan for Removal of Coal Tar Impacted Soil on Washington Street Between W. Court and Cascadilla Streets

Draft Interim Remedial Measures Work Plan for Removal of Coal Tar Impacted Soil on Washington Street Between W. Court and Cascadilla Streets
Author: New York State Electric and Gas Corporation
Publisher:
Total Pages:
Release: 2005
Genre: Coal-tar
ISBN:


Download Draft Interim Remedial Measures Work Plan for Removal of Coal Tar Impacted Soil on Washington Street Between W. Court and Cascadilla Streets Book in PDF, Epub and Kindle

This document describes the draft work plan for the removal and disposal of coal tar impacted soil that exists along the west side of Washington Street, between W. Court and Cascadilla Streets in the City of Ithaca, New York. This area was contaminated by the subsurface wooden ducts on W. Court St. that transported coal tar from the Court Street former manufactured gas plant site to tar wells located at the Cayuga Inlet coal tar transfer site. The Work Plan describes the techniques to be utilized for the sampling, community air monitoring, excavation, material handling, waste characterization, transportation and disposal of coal tar impacted soil and materials.